We were fortunate to be asked to redo the half bath downstairs.
We repaired some drywall above the window and on the bottom.
We installed new tile floor, vanity, mirror, and toilet. In addition, we also painted the walls and ceiling and replaced the old base boards with new and added 1/4" shoe molding.
Yes, we're appreciative of the opportunity.
Comments